
AI image
A Fairbanks entrance is closed while crews build a year-round bike path
The main entrance to South University Avenue in Fairbanks has been closed since Monday and is expected to stay closed through Sept. 14. The state has not posted hours, a detour, or whether people on foot or bikes can still get through.
The work is the start of a 1.8-mile path for bicycles and pedestrians running up the east side of University Avenue South, from the Mitchell Expressway to Armistead Way. It is designed for year-round use, meaning it is meant to be usable through a Fairbanks winter rather than disappearing under snow until spring.
Crews are also working on East Ramp Road, 7 am to 7 pm Monday through Saturday. When it is finished the path is to connect to East Ramp airport facilities and existing sidewalks, with new pavement, drainage and signs.
Source: Alaska DOT&PF, Alaska DOT&PF: Closure: University Avenue β UNIVERSITY AVE SOUTH BICYCLE/PED FACILITY: Road closure at the main entrance of South University Ave from September 8 - 14. ().
AI-assisted. No editor review is on record for this article. Who is accountable.
Primary sources (1)
Stay informed. Support what matters.
Free, permanent access to local news you can verify. Subscribe to support Walter AlaskaNews and go ad-free.
Related Coverage
Chena Small Tracts Road closed for the season as roundabout goes in
Alaska News Β· 1mo ago
Old Chena Ridge Road closed for duration of roundabout construction
Alaska News Β· 3w ago
One Floodplain Study Stands Between Fairbanks and a Finished River Walk
Alaska News Β· 2mo ago
West Tudor Road down a lane each way through Sunday for asphalt patching
Alaska News Β· 5d ago
Right lane closes on E Tudor Road eastbound Monday for drainage work
Alaska News Β· 1w ago
Comments
Sign in to leave a comment.
No comments yet. Be the first to share your thoughts.