AlaskaNews
My Feed

Content discovery

Topics

Issues and interests

Locations

News by place

Organizations

Agencies, boards, and groups

Elections

Elections and time-bounded civic events

Calendar

Upcoming meetings and civic events

Source material

People

People quoted on the platform

Transcripts

Search every public meeting (subscribers)

Video Clips

Quoted moments on video

Photos

Community gallery

Podcasts

Articles read aloud

How It WorksLog inSign up
AlaskaNewsAlaska News

Local news, from the source.

Public meetings deserve coverage.
Every claim links to the original source.

Browse

  • My Feed
  • Topics
  • Locations
  • Organizations
  • Elections
  • People
  • TranscriptsSubscribers
  • Podcasts
  • Calendar
  • Photos
  • Video Clips

Get involved

  • Subscribe
  • Submit a Tip
  • Join a Community
  • Become a Journalist
  • Compute Volunteers
  • About
  • Contact

Resources

  • RSS
  • How It Works
  • API
  • Privacy
  • Terms

© 2026 Communities News LLC. All rights reserved.

Part of the Communities News platform

Potter Drive designs test Anchorage guidance on in-street bike lanes

Cover image for article: Potter Drive designs test Anchorage guidance on in-street bike lanes

Potter Drive designs test Anchorage guidance on in-street bike lanes

by Walter AlaskaNews·Jun 2, 2026(2mo ago)
2 min readPotter Drive, AnchorageAI
Share

Anchorage planners will review four design options for Potter Drive that would add its first sidewalks and bike lanes, though two conflict with a city plan recommending a separated bikeway.

Potter Drive has no sidewalks or pathways today. Pedestrians and bicyclists currently share travel lanes or narrow, intermittent shoulders with vehicle traffic. Four design options the Alaska Department of Transportation and Public Facilities has put before Anchorage planners would give the corridor its first dedicated space for people walking and biking, while also addressing deteriorated pavement and drainage. The report acknowledges that two adopted city and regional plans disagree about what that space should look like.

The Anchorage Planning and Zoning Commission is scheduled to take up the concept report as an informational item Monday, Aug. 10, at 6:30 p.m. at the Z.J. Loussac Library. No vote on a design is scheduled.

The conflict sits in the plans themselves. The Municipality of Anchorage Official Streets and Highways Plan classifies Potter Drive as an Industrial Commercial Collector. Its street typology says bicycle and pedestrian travel should be accommodated on industrial streets, but that in-street bike lanes are rare and sidewalks are held to the code minimum width. The AMATS Non-Motorized Plan, adopted in November 2021, recommends Potter Drive for a separated bikeway and ranks it a medium priority. The report, prepared by consultant DOWL for DOT&PF, states plainly that the bikeway recommendation contrasts with the industrial street typology.

Two of the four options would add on-street bicycle lanes rather than the separated bikeway the Non-Motorized Plan recommends.

  • Option A pairs two 6-foot on-street bicycle lanes and 11-foot travel lanes with a sidewalk on one side.

  • Option B adds a second sidewalk, making it the widest option and requiring the most right-of-way acquisition.

  • Option C provides sidewalks and 2-foot buffers on both sides, leaving cyclists to use the roadway or the sidewalk.

  • Option D provides a 10-foot shared-use pathway and a buffer on one side.

All four concepts have been identified for further evaluation. Several key considerations remain unresolved, including intersection control at Arctic Boulevard, potential lighting improvements and whether overhead utilities should be undergrounded.

Preliminary public input supports bicycle accommodations, the report says, though some comments raised concern about on-street lanes with no buffer separating cyclists from traffic.

The corridor runs 0.77 miles from Arctic Boulevard to Dowling Road past breweries, mechanic shops, storage yards, a gymnastics studio, a church and homes. The right-of-way is typically 60 feet, with some buildings directly abutting it and a dense mix of overhead and buried utilities. Planned curb, gutter and driveway upgrades along the corridor may change existing driveway configurations and could affect property access and parking layouts for adjacent owners.

InfrastructureAnchorageAnchorage Planning and Zoning CommissionTransportationAlaska Department of Transportation & Public Facilities

AI-assisted, reviewed by editors. Spot an error?

Reviewed by News Bot

Related Coverage

A plan would move Anchorage's bike route off the highways onto trails

Alaska News · 3d ago · 79% match

Planning Commission accepts DOT concept for Tudor Road interchange redesign

Alaska News · 3mo ago · 78% match

A protected Potter Marsh hillside faces access questions at an Aug. 10 hearing

Alaska News · 4d ago · 78% match

The state is drilling test holes for a Seward Highway fix, as a bigger $1.5 billion plan draws fire

Alaska News · 1d ago · 77% match

Anchorage Assembly will vote June 23 on $214,684 for a pedestrian safety campaign

Alaska News · 1mo ago · 77% match

Two public open house meetings are planned, the second before right-of-way appraisal and acquisition begins. A project website will accept comments throughout design. The 2050 Metropolitan Transportation Plan lists the work at a 2022 estimate of $7.85 million. DOT&PF plans to hand the road to the municipality once the rehabilitation is done.

Stay informed. Support what matters.

Free, permanent access to local news you can verify. Subscribe to support Walter AlaskaNews and go ad-free.

SubscribeHow it works →Sign up free

Community photos

Have a photo that captures this story? Share it — the community votes on covers.

+ Sign up to add a photo

Comments

Sign in to leave a comment.

No comments yet. Be the first to share your thoughts.