
Matthew Goddard
10:09 - 10:24
“Based on the supplied ADT, the proposed internal street will need to be constructed to borough residential street standards pursuant to the 2022 subdivision Division Construction Manual.”
- Speaker
- Matthew Goddard
- Timestamp
- 10:09 – 10:24
- Community
- Alaska News
- Location
- Matanuska-Susitna Borough
- Captured at
- October 15, 2026
From the transcript
This is at exhibit pages 7 through 18. Steven Panone, registered professional engineer, notes that a— as required by MSB 4322-81 and based on available soils, existing water table information, groundwater monitoring results, and the proposed preliminary plat, Each of the proposed lots can provide at least 10,000 square feet of contiguous usable septic area and an additional 10,000 square feet of usable building area. A preliminary road and drainage plan was submitted and is seen at exhibit pages 19 through 27. An ADT was submitted, as seen at exhibit pages 32 and 33. Based on the supplied ADT, the proposed internal street will need to be constructed to borough residential street standards pursuant to the 2022 subdivision Division Construction Manual.
Related Coverage
Mat-Su Platting Board approves six-lot subdivision near Engstrom Road
Six new lots near Engstrom Road got the OK. Neighbors worry about the Bogard-Engstrom intersection; the road meant to ease it is picked but not funded.
