
Tyler Young
55:27 - 55:53
"The minimum lot size on this, since it's a community sewer— I'm sorry, community water— is 20,000 square feet, about half an acre. There will be no lots smaller than that."
“The minimum lot size on this, since it's a community sewer— I'm sorry, community water— is 20,000 square feet, about half an acre. There will be no lots smaller than that.”
We have reviewed this very thoroughly, and we've worked with both petitioner, the surveyor, and the engineer to make sure that everything is going to be done correctly. The minimum lot size on this, since it's a community sewer— I'm sorry, community water— is 20,000 square feet, about half an acre. There will be no lots smaller than that. I don't believe that you have a utility lot or anything like that that is less than 20,000 square feet. No, so all lots will be 20,000 square feet minimum.
The Mat-Su Borough Platting Board approved the preliminary plat for Primrose Point Phase 4 without objection, relocating an internal road to meet grade requirements, but left shared driveway access for four to five lots fronting Lone Cub Drive to be resolved during pre-construction engineering. Neighbors who have tracked the project since 2005 called the timeline incomplete.

The Mat-Su Borough Platting Board unanimously approved the Starlight Subdivision master plan Thursday, authorizing up to 184 lots across 200 acres near West Carmel Road in 13 phases over 10 years, despite written objections from neighbors citing traffic on a washboarded gravel road, mail delivery problems, and one landowner's concern about a planned private airstrip next door.
