Skip to main content
0:45

Chris Kerlin

11:57 - 12:42

"PD&E suggests Lot 20 take access from Ashbrook Drive and Lots 16, 17, 18, and 19 share common accesses to Lone Cub Drive. Please note that per, per the 2022 Subdivision Construction Manual A043C, space shall be provided on these lots for turnaround so the vehicles will not have to back out onto minor collector streets. Staff notes the issue was unresolved at the time of this report."

“PD&E suggests Lot 20 take access from Ashbrook Drive and Lots 16, 17, 18, and 19 share common accesses to Lone Cub Drive. Please note that per, per the 2022 Subdivision Construction Manual A043C, space shall be provided on these lots for turnaround so the vehicles will not have to back out onto minor collector streets. Staff notes the issue was unresolved at the time of this report.”
Speaker
Chris Kerlin
Community
Alaska News
Location
Wasilla
Captured at
July 20, 2026

From the transcript

Comments: MSB, pre-design and engineering. As previously stated on June 2nd, the portion of Lone Cub Drive fronting the subdivision is classified on the OSHPD as a minor collector. PD&E suggests Lot 20 take access from Ashbrook Drive and Lots 16, 17, 18, and 19 share common accesses to Lone Cub Drive. Please note that per, per the 2022 Subdivision Construction Manual A043C, space shall be provided on these lots for turnaround so the vehicles will not have to back out onto minor collector streets. Staff notes the issue was unresolved at the time of this report.

Related Coverage

Mat-Su Platting Board approves Primrose Point Phase 4 preliminary plat despite unresolved driveway questions

The Mat-Su Borough Platting Board approved the preliminary plat for Primrose Point Phase 4 without objection, relocating an internal road to meet grade requirements, but left shared driveway access for four to five lots fronting Lone Cub Drive to be resolved during pre-construction engineering. Neighbors who have tracked the project since 2005 called the timeline incomplete.

Maggie AlaskaNewsby Maggie AlaskaNews2mo ago1 min read
Wasilla, Alaska
Cover image for article: Mat-Su Platting Board approves Primrose Point Phase 4 preliminary plat despite unresolved driveway questions

Mat-Su Platting Board approves Starlight Subdivision master plan over neighbor objections

The Mat-Su Borough Platting Board unanimously approved the Starlight Subdivision master plan Thursday, authorizing up to 184 lots across 200 acres near West Carmel Road in 13 phases over 10 years, despite written objections from neighbors citing traffic on a washboarded gravel road, mail delivery problems, and one landowner's concern about a planned private airstrip next door.

Maggie AlaskaNewsby Maggie AlaskaNews2mo ago1 min read
Knik, Alaska
Cover image for article: Mat-Su Platting Board approves Starlight Subdivision master plan over neighbor objections