Skip to main content
RH

Rod Hanson

Representative · North Lakes Community Council

Verified

10 articles · 6 transcripts · 2 clips

Affiliations

North Lakes Community Council

Comments close Friday on Mat-Su plan setting which roads can get federal money

Public comment on MatSu 2050, the Valley's first federal transportation plan, closes Friday, Oct. 30. Without an adopted plan, the region loses access to federal road, pathway and transit money.

Cover image for article: Comments close Friday on Mat-Su plan setting which roads can get federal money

Mat-Su manager tallies $386 million in outside grants, led by $249 million rail award

Mat-Su Borough is getting $386 million in outside grants, led by $249 million to finish the Port MacKenzie rail extension.

Cover image for article: Mat-Su manager tallies $386 million in outside grants, led by $249 million rail award

Mat-Su Assembly accepts $2.5 million to refrigerate the ice at Big Lake's rink

Big Lake's rink waits on cold weather to make ice. The Mat-Su Assembly took $2.5 million from the Mat-Su Health Foundation to make its own instead.

Cover image for article: Mat-Su Assembly accepts $2.5 million to refrigerate the ice at Big Lake's rink

Mat-Su counts at least 763 buildings likely too close to lakes as Assembly weighs a fix

Mat-Su counts at least 763 lakefront buildings likely too close to the water, maybe double that. A one-page plan would give owners a year to go legal.

Cover image for article: Mat-Su counts at least 763 buildings likely too close to lakes as Assembly weighs a fix

Talkeetna residents ask Mat-Su Assembly for hearings on water tank site before Nov. 17

Talkeetna residents asked Mat-Su Assembly for formal hearings on a water tank site before a Nov. 17 briefing. They say the site pick drew opposition since January with no public input.

Cover image for article: Talkeetna residents ask Mat-Su Assembly for hearings on water tank site before Nov. 17

Mat-Su Assembly writes scenic trail opposition into Rasmuson grant resolution

Mat-Su Assembly added opposition to National Scenic Trail status for the Alaska Long Trail to a $300,000 grant resolution, citing use restrictions and loss of local control.

Cover image for article: Mat-Su Assembly writes scenic trail opposition into Rasmuson grant resolution

Mat-Su Assembly pulls Engstrom road reconsideration without debate

Mat-Su Assembly dropped a reconsideration of the Engstrom Road connector, leaving a September vote in place for the $21.6 million northern route over a $9.1 million southern option.

Cover image for article: Mat-Su Assembly pulls Engstrom road reconsideration without debate

Mat-Su Assembly member moves to reconsider the pricier Engstrom-Trunk road route

“If you're trying to affect safety in that area, the southern route does so, the northern route does not.”

Cover image for article: Mat-Su Assembly member moves to reconsider the pricier Engstrom-Trunk road route

Mat-Su kept the Long Trail sign, and the $300,000 that came with it

Mat-Su took $300,000 and kept the trail sign some members worried would invite federal control. The borough's own attorney said it would not.

Cover image for article: Mat-Su kept the Long Trail sign, and the $300,000 that came with it

Mat-Su explores building the troopers a new home and leasing it back

Mat-Su is exploring building troopers a $13 million facility and leasing it back. Troopers now work from six buildings never designed for police work.

Cover image for article: Mat-Su explores building the troopers a new home and leasing it back