Skip to main content
0:46

Linda Oxley

29:53 - 30:40

“We've given you a binder of facts about why the Zero Lake site is such a poor location, starting with it's located right next to properties owned, actively used, and being developed into full-time homes.”
Speaker
Linda Oxley
Community
Alaska News
Location
Matanuska-Susitna Borough
Captured at

From the transcript

We've given you a binder of facts about why the Zero Lake site is such a poor location, starting with it's located right next to properties owned, actively used, and being developed into full-time homes. At a minimum, no private property should suffer the devastating consequences that this type of development would bring. We've given you information on the lack of fire service coverage, the fires that have started at other firing ranges, described the heavy use of the entire area for multiple types of year-round use. By residents and visitors alike, and describe the parts of the cost burden that trying to address the necessary infrastructure will mean. We've advised you that the borough does not own any part of the trail, which is called a road.

Related Coverage

Mat-Su sets aside Zero Lake Road land for a future shooting range

Mat-Su set aside land for a shooting range over a year of neighbor objections. One cabin owner's structure sits about 1,000 feet downrange.

Cover image for article: Mat-Su sets aside Zero Lake Road land for a future shooting range

Mat-Su Assembly rejects lowering its property tax cap to 7 mills

Mat-Su's Assembly rejected lowering its tax cap to 7 mills after the borough warned it would force $22 million in cuts — schools and ambulances included.

Cover image for article: Mat-Su Assembly rejects lowering its property tax cap to 7 mills

ENSTAR raised its gas line relocation estimates and Mat-Su road budgets absorb the cost

ENSTAR nearly doubled its estimates on eight Mat-Su road projects. The borough has to absorb it, and there is no other gas utility it could call.

Cover image for article: ENSTAR raised its gas line relocation estimates and Mat-Su road budgets absorb the cost