“Applicant will adhere to proposed hours of operation, 7:00 AM to 7:00 PM, with the allowance of outside hours being utilized on an as-needed project-specific basis and not ongoing.”
- Speaker
- Kevin Buettner
- Timestamp
- 23:37 – 23:47
- Community
- Alaska News
- Location
- Kenai
- Captured at
From the transcript
4, The applicant will limit noise disturbance and not use compression release engine brakes, or known as Jake brakes. Applicant will adhere to proposed hours of operation, 7:00 AM to 7:00 PM, with the allowance of outside hours being utilized on an as-needed project-specific basis and not ongoing.
Related Coverage
Kenai planners approve Beaver Loop gravel pit below the water table
Kenai planners OK'd a gravel pit off Beaver Loop Road that digs below the water table and is planned to end as a lake. No one from the public objected.