Skip to main content

Editorial map (Gemini + Google Maps)

Fairbanks borough Assembly to decide on lifting a no-build zone along Sheep Creek

by Walter AlaskaNews
2 min readFairbanks, Alaska

An ordinance before the Fairbanks North Star Borough Assembly would lift a no-build zone along Sheep Creek on two rural lots off Sheep Creek Road, letting the owners build closer to the creek. The Assembly is set to hold a public hearing Dec. 17.

The borough's Outdoor Recreation zone bars buildings within 50 feet of each bank, according to a staff report by Sarah Bingham, a borough planner. A 25-foot public pedestrian access easement and building setback along each bank would stay. It comes from the state's 1988 land patent for one lot and is shown on the subdivision plat for the other. Lifting the zone would end the zoning bar on buildings from 25 to 50 feet from the creek.

The report says land around the creek is classified as freshwater forested/shrub wetland, and the U.S. Army Corps of Engineers regulates development in wetlands.

The lots sit north of Trilby Avenue, west of Sheep Creek Road and south of Murphy Dome Road. Jim and Cheryl Sackett own the 40-acre lot, where Jim Sackett, the applicant, is building a 900-square-foot home. The Barber Revocable Trust holds the 11-acre lot next door, in the Forrest Glen subdivision, and wrote in support. Both lots would keep their main zones, Rural and Agricultural and Rural Estate, which allow no more than two dwellings per lot.

Borough planners met with Sackett on Aug. 7 about narrowing the zone to 25 feet. He asked to remove it instead. "The split zoning on my parcel is both confusing and unnecessary," Sackett wrote. None of the lots around them carry the zone, the staff report says.

Michael Hansen, who owns a lot in Forrest Glen beside the Barbers' land, objected in writing. He wrote "No No No" and said he hikes the trail. He also wrote that Sackett has posted no-trespassing signs and knew of the zoning before buying the land. "Leave it as is," Hansen wrote.

Sackett told the borough Planning Commission on Oct. 13 that no trail runs along the creek easement through his property. He said the trail neighbors described follows a section line easement at the property's edge, a strip along the survey line that the patent dedicates to the state for public highways, which the rezone does not change. No one testified at that hearing, and the commission voted 10-0 to recommend approval, according to its minutes.

The Assembly zoned the creek strip in May 1979, as the state prepared to sell 173 acres there. Bingham's report says the zone's purpose narrowed in 1988 to public land, and to private land only "if requested by the property owner." The owners of both lots signed this request.

Residents can testify at the Dec. 17 hearing before the Assembly decides.

Made by our human newsroom with AI. How humans and AI work here · Grow with our newsroom ·

Assembled from public records the newsroom collected.