
Chena Bridge Winter Prep
2h ago1 min read
Richardson Highway bridge crews at Milepost 346 are consolidating materials for winter shutdown, with reduced lanes 9 am to 3 pm on the $89.2 million Chena Flood Control bridges project.
0:26

Richardson Highway bridge crews at Milepost 346 are consolidating materials for winter shutdown, with reduced lanes 9 am to 3 pm on the $89.2 million Chena Flood Control bridges project.